Back to saparnis.devPaulius Šaparnis · interactive installations
Technical plan · interactive light installations

Crowd-played façades and screens: setup, requirements and options

How it works, how a façade is projected, five ways to set it up, and who provides what. For event organisers and their technical teams.

Artist
Paulius Šaparnis, Vilnius
Document
v1.0 · 20 Oct 2026
Applies to
Blocks, Ping Pong, message wall, bespoke pieces
Contact
paulius@saparnis.dev
Artist providesVenue providesAV partner (arranged by artist)Audience

1Summary

People play a building or screen from their own phones. They scan a QR code, wait in a live queue, then use the phone as the controller. The image is a live web page, not a video, so anything that can show a web page can run it.

Venue receivesOne web link per playfield, plus one for sound. No video files.
PlayfieldOne window, wall section or screen area = one game
Players at once1 per playfield, or 2 per court for versus games
InternetAudience: own mobile data. Venue: wired line at the control position
Turn lengthUp to ~5 min, set live
Lead time~2 weeks for an existing piece, ~6 weeks for a new one
Shown atVilnius Light Festival 2025 and 2026

2How the system works

Phones talk to the artist's server, which runs the games and the queue. The venue's screen or media server just opens a link. Nothing is installed on venue machines.

PartWhere it runsWho
Phone controllerVisitor's phone browser, via QR codeAudience
Games and queueArtist's server, onlineArtist
Playfield and sound linksOpened by the venue's media server, LED player or computerArtist
Live settingsArtist's laptop, on site or remoteArtist
Screen or projectors, PAAt the venueVenue or Partner

3Playfields and projection

Each window or wall section gets its own link. The game grid follows the real divisions of the façade, and the video team places each link onto its window.

Example: a façade with six windows in two rows. Piers between windows stay dark; only the windows are lit.

  1. Survey. The venue sends a straight-on photo or drawing with dimensions, and where projectors can stand.
  2. Playfields. One playfield per window or wall section, with the grid matched to it. At Blocks, one glass block was one pixel.
  3. Links. One link per playfield, in the right proportions, sent to the video team weeks ahead.
  4. Mapping. The video team masks each link to its window and corrects perspective. They choose the number and position of projectors.
  5. On site. Final alignment on the real building. Line widths and colours are tuned live, without remapping.

On an LED screen there is no mapping: the link simply fills the screen.

4Deployment options

Same software, five setups. They differ in who is on site and what plays the link.

OptionArtist on siteWhat plays the linkVenue staff needed

5Choosing an option

Pick the answers for your event.

Surface
AV team or screen operator on site
Screen player can open a web page
Artist presence

6Technical requirements

For option A, the on-site show. Other options need less; see section 4.

Network
Wired internet at the control position
Mobile coverage where the audience stands
Guest Wi-Fi as a backupRecommended
Display
Projectors or LED covering all playfields
Media server that opens web pages (e.g. Resolume, Millumin)
Video technician for mapping and shows
HDMI input, in case the media server cannot open web pagesFallback
Site
Seat, table and power at the control position
Audio machine into the PAIf sound is used
Power, permits and setup access
Audience
QR signs printed and placed (artwork from the artist)
Viewing area with a clear view of the playfields and room for a queue

Everything without a tag is required.

7Audience, queue and capacity

A turn ends when the player loses or hits the time limit. On busy nights turns are shortened live. At Blocks, about 80 people queued 20–30 minutes.

120players per hour
480players per night

Rough estimate with full turns. Real turns are often shorter.

8Schedule

Mapping is prepared before arrival, so on site only alignment and a phone test remain.

Go-ahead

Brief and option agreed

Site photos, dimensions, dates, audience; setup option chosen.

ArtistVenue
~2 or ~6 weeks

Build

Existing piece adapted (~2 weeks) or new piece made (~6 weeks).

Artist
Before arrival

Links and remote test

Links sent; video call with the technician to open them, map them and check the network.

ArtistVenue
On site

Alignment and phone test

Playfields aligned to the building; full test with real phones from the viewing area.

ArtistVenue
Show nights

Live operation

Queue open; difficulty and turn length tuned to the crowd.

Artist

9Risks and fallbacks

IfThen
The media server can't open web pagesArtist's laptop feeds the video chain over HDMI
Mobile network is overloadedAudience switches to guest Wi-Fi
Venue internet dropsSwitch to a backup connection agreed in advance
Players feel lagShorten the video processing chain; checked in tests
The queue gets too longShorter turns and higher difficulty, set live

10Information for a quote

SitePhotos of the façade, wall or screen, with approximate dimensions
SurfaceProjection or LED; for LED, size, resolution and player model
DatesEvent days, show hours, setup access
AudienceExpected numbers and where people will stand
Local techAV or projection supplier already booked, if any
ThemeEvent concept or brand, or an existing piece
Nothing here is fixed.

Every part of this plan can be discussed and adjusted: options combined, the setup fitted to your site, or a piece made from scratch for your event. Please share your ideas and needs, even rough or unusual ones. That is often where the best pieces start.

Emailpaulius@saparnis.dev
Phone, WhatsApp+370 618 45210

← Back to saparnis.dev · Work · Festivals