Crowd-played façades and screens: setup, requirements and options
How it works, how a façade is projected, five ways to set it up, and who provides what. For event organisers and their technical teams.
1Summary
People play a building or screen from their own phones. They scan a QR code, wait in a live queue, then use the phone as the controller. The image is a live web page, not a video, so anything that can show a web page can run it.
| Venue receives | One web link per playfield, plus one for sound. No video files. |
| Playfield | One window, wall section or screen area = one game |
| Players at once | 1 per playfield, or 2 per court for versus games |
| Internet | Audience: own mobile data. Venue: wired line at the control position |
| Turn length | Up to ~5 min, set live |
| Lead time | ~2 weeks for an existing piece, ~6 weeks for a new one |
| Shown at | Vilnius Light Festival 2025 and 2026 |
2How the system works
Phones talk to the artist's server, which runs the games and the queue. The venue's screen or media server just opens a link. Nothing is installed on venue machines.
| Part | Where it runs | Who |
|---|---|---|
| Phone controller | Visitor's phone browser, via QR code | Audience |
| Games and queue | Artist's server, online | Artist |
| Playfield and sound links | Opened by the venue's media server, LED player or computer | Artist |
| Live settings | Artist's laptop, on site or remote | Artist |
| Screen or projectors, PA | At the venue | Venue or Partner |
3Playfields and projection
Each window or wall section gets its own link. The game grid follows the real divisions of the façade, and the video team places each link onto its window.
Example: a façade with six windows in two rows. Piers between windows stay dark; only the windows are lit.
- Survey. The venue sends a straight-on photo or drawing with dimensions, and where projectors can stand.
- Playfields. One playfield per window or wall section, with the grid matched to it. At Blocks, one glass block was one pixel.
- Links. One link per playfield, in the right proportions, sent to the video team weeks ahead.
- Mapping. The video team masks each link to its window and corrects perspective. They choose the number and position of projectors.
- On site. Final alignment on the real building. Line widths and colours are tuned live, without remapping.
On an LED screen there is no mapping: the link simply fills the screen.
4Deployment options
Same software, five setups. They differ in who is on site and what plays the link.
| Option | Artist on site | What plays the link | Venue staff needed |
|---|
5Choosing an option
Pick the answers for your event.
6Technical requirements
For option A, the on-site show. Other options need less; see section 4.
| Network | |
|---|---|
| Wired internet at the control position | |
| Mobile coverage where the audience stands | |
| Guest Wi-Fi as a backup | Recommended |
| Display | |
| Projectors or LED covering all playfields | |
| Media server that opens web pages (e.g. Resolume, Millumin) | |
| Video technician for mapping and shows | |
| HDMI input, in case the media server cannot open web pages | Fallback |
| Site | |
| Seat, table and power at the control position | |
| Audio machine into the PA | If sound is used |
| Power, permits and setup access | |
| Audience | |
| QR signs printed and placed (artwork from the artist) | |
| Viewing area with a clear view of the playfields and room for a queue | |
Everything without a tag is required.
7Audience, queue and capacity
A turn ends when the player loses or hits the time limit. On busy nights turns are shortened live. At Blocks, about 80 people queued 20–30 minutes.
Rough estimate with full turns. Real turns are often shorter.
8Schedule
Mapping is prepared before arrival, so on site only alignment and a phone test remain.
Brief and option agreed
Site photos, dimensions, dates, audience; setup option chosen.
Build
Existing piece adapted (~2 weeks) or new piece made (~6 weeks).
Links and remote test
Links sent; video call with the technician to open them, map them and check the network.
Alignment and phone test
Playfields aligned to the building; full test with real phones from the viewing area.
Live operation
Queue open; difficulty and turn length tuned to the crowd.
9Risks and fallbacks
| If | Then |
|---|---|
| The media server can't open web pages | Artist's laptop feeds the video chain over HDMI |
| Mobile network is overloaded | Audience switches to guest Wi-Fi |
| Venue internet drops | Switch to a backup connection agreed in advance |
| Players feel lag | Shorten the video processing chain; checked in tests |
| The queue gets too long | Shorter turns and higher difficulty, set live |
10Information for a quote
| Site | Photos of the façade, wall or screen, with approximate dimensions |
| Surface | Projection or LED; for LED, size, resolution and player model |
| Dates | Event days, show hours, setup access |
| Audience | Expected numbers and where people will stand |
| Local tech | AV or projection supplier already booked, if any |
| Theme | Event concept or brand, or an existing piece |
Every part of this plan can be discussed and adjusted: options combined, the setup fitted to your site, or a piece made from scratch for your event. Please share your ideas and needs, even rough or unusual ones. That is often where the best pieces start.